Are you a duty holder under CDM 2015? Here’s what you need to do

CDM Consultants

The UK Construction (Design & Management) regime was introduced to improve health and safety during construction projects. The latest version of the legislation, which took effect in 2015, brought in some changes, and if you’re a duty holder under CDM it’s important to understand your role within a project.

Failing to comply with CDM regulations has serious ramifications including hefty fines, and the potential for litigation and criminal charges in some cases. The Health and Safety Executive (HSE) is the body responsible for managing occupational health and safety in the UK and has the power to prosecute those who fail in these duties.

So are you a duty holder under CDM 2015, and if so, what are your responsibilities?

Duty holders under CDM

Client

Domestic clients don’t typically take on the role of duty holder, which tends to transfer to other parties such as contractors or designers. Commercial clients, however, have been assigned greater responsibilities under CDM 2015, including notifying projects to the Health and Safety Executive, and ensuring on-site health and safety is being correctly managed.

Designer

As a designer, you may be an engineer, surveyor, architect, or other individual/organisation preparing or reworking building project designs, or perhaps coordinating or organising others to do this. Your duties include managing, and eliminating where possible, risks within a project and in a building’s future. 

Principal designer

Principal designers are appointed for projects with more than one contractor. If you’re a principal designer your duties include managing and monitoring health and safety in the pre-construction phase, and making sure designers fulfil their obligations as duty holders under CDM.

Contractor

A contractor can be a business or individual managing construction work, or employing construction workers to carry out a project. As a contractor you must monitor the work on-site and minimise any risks to health and safety. You also need to co-ordinate your workers with those in other teams if more than one contractor has been appointed.

Principal contractor

A principal contractor may be appointed by a client if more than one contractor is involved in the project. If you’re a principal contractor you’ll need to prepare a plan for different phases of the project, and coordinate the various contractors, whilst also liaising closely with the client and principal designer.

Worker

Under CDM 2015, workers need to assess their own health and safety and that of their co-workers, report any issues they believe may compromise health and safety during the construction project, and cooperate with other duty holders.

All duty holders under CDM are expected to liaise with each other, dispensing the necessary information up and down the line so health and safety risks within the project are minimised.

Acorn Safety Services are health and safety consultants offering CDM consultancy services. We’ll ensure your compliance with the regulations as a duty holder under CDM. Please contact one of our experienced consultants to find out more about these regulations and your responsibilities.


More Health and Safety Articles

IBO Construction 1

IBO Construction Ltd – Health and Safety Consultant Service Case Study

Acorn Safety Services partnered with IBO Construction Ltd to elevate their health and safety standards, conducting comprehensive audits and providing expert consultancy. This collaboration led to a significant improvement in IBO's safety record, with no RIDDOR incidents, showcasing the importance of independent health and safety assessments in the construction industry.

Case Study -Planned Preventative Maintenance (PPM) the responsible thing to do 1st!

Acorn Safety Services implemented a Planned Preventative Maintenance (PPM) program for a Nursery School, focusing on Legionella prevention. Through meticulous planning and minimal disruption, they ensured the school's water systems were safely maintained. The project highlighted the importance of proactive maintenance over costly remedial work, with the client praising Acorn's efficient management and clear communication, ensuring a safe environment for children and staff.

The finished Pharmacy project

Northampton General Hospital – CDM Consultancy Case Study

Acorn Safety Services successfully managed a complex CDM consultancy project at Northampton General Hospital, overseeing the installation of a new automated pharmacy system. Their role as principal contractors ensured a seamless operation, from planning through execution, including the safe removal of asbestos and the installation of modern pharmacy automation. This project not only improved the hospital's efficiency in medicine delivery but also highlighted Acorn's expertise in managing health and safety risks in a critical healthcare setting.

Legionella testing is an essential part of health and safety

Legionella Testing Could Save Your Life this World Water Day

HELD each year since 1993, World Water Day on March 22 is an important day for many, focussing on the importance of access to fresh water. According to the UN, which organises the annual event, as many as 2.2 billion ...

12341 Next